View original ↗on bundestag.de
policy instrument · 1 January 2026
German Federal Budget 2026 — negative emissions / CDR funding line (BMUKN)
Jurisdiction countryGermany
Instrument typegrant-rd
Authoritygovernment
Scopecarbon removal only
Statusfunded
DetailFirst dedicated negative-emissions line in a German federal budget, reported under the Federal Environment Ministry (BMUKN): predominantly project/R&D funding with an EUR 11.5M component for direct government purchasing of CO2-removal certificates to stimulate demand. The 2026 Bundeshaushalt (EUR 524.54B total) was passed by the Bundestag on 28 Nov 2025 and approved by the Bundesrat on 19 Dec 2025
Monetary noteDraft budget: >EUR 111M for negative emissions in 2026 — ~EUR 98M project funding, EUR 11.5M for purchase of CO2-removal certificates (federal CDR procurement pilot), ~EUR 2M administration — plus EUR 320M in commitment authorizations (Verpflichtungsermaechtigungen) through 2033; a further EUR 44.6M elsewhere in the budget for soils as carbon storage.
Confidencemedium
Unverified noteThe EUR 111M / 98M / 11.5M breakdown was verified only against the July 2025 government DRAFT budget (via DVNE and libmod coverage, Aug 2025); the exact figures in the finally enacted budget (passed Nov/Dec 2025) could not be confirmed line-by-line from bundeshaushalt.de in this session. Ministry attribution is BMUKN (environment ministry) per DVNE, not BMWE as the tasking suggested.
Merged duplicates[object Object]
Pathway scopeall-cdr
Pathway notedescribed as a general negative-emissions/CDR funding line with no specific pathway named
Stated jurisdictionDE
Follow this policy, see every policy in the database, or ask about it.
A free account searches the whole database and saves records. Pro adds Ask, a watch list, totals, exports and the plugin for Claude and ChatGPT. New accounts get 14 days of Pro, no card needed.
